Skip to Content


Folding Doors

Let yourself be moulded...How does that work with installation of a moulding?


Moulding View Rapid


Moulding View New Generation


Moulding View Eurostar

Measuring and installing a moulding:

Moulding is installed to cover the track at the top of the folding door. It creates a visually clean completion to the door.

One does not always have enough room on both sides of the door to install a moulding. There are also installation situations where installation of one-sided moulding is necessary, (.i.e. division of an alcove or a walk-in closet).

In order to support your planning, we will inform you of the measurements for installation of a folding door or moulding.

In the following photos, we will show you the installation of moulding with the measurements for the track (x) and the moulding (y).


Installation view of both sides of the moulding (Eurostar, President, NewGeneration)


Installation view of both sides of the moulding (Rapid)


What is the minimum depth for the door frame/wall when moulding is to be installed on both sides?

  • Rapid y+x+y: 49+22+49mm = 120mm
  • Eurostar y+x+y: 47+25+47mm = 119mm
  • President y+x+y: 65+28+65mm = 158mm
  • NewGeneration y+x+y: 65+28+65mm = 158mm

What is the minimum depth for the door frame/wall when moulding is to be installed on only one side?

  • Eurostar x+y: 25+47mm = 72mm
  • President x+y: 28+65mm = 93mm
  • NewGeneration x+y: 28+65mm = 93mm

What is the minimum depth for the door frame/wall when no moulding is to be installed?

  • Rapid x: 22mm
  • Eurostar x: 25mm
  • President x: 28mm
  • NewGeneration x: 28mm

Rapid x+y: 22+49mm = 71mm